Our Scaffolding in Action
L’Acadie Traffic Circle
For this project, formwork panels of more than 40 feet (13 m) high were used. (Particular situation: with a setting time of 12 hours for 50 MPa high perfomance concrete, our equipment easily resisted the enormous pressure that was inflicted.)
<< Previous | Next >>