Our Scaffolding in Action

L’Acadie Traffic Circle
For this project, formwork panels of more than 40 feet (13 m) high were used. (Particular situation: with a setting time of 12 hours for 50 MPa high perfomance concrete, our equipment easily resisted the enormous pressure that was inflicted.)
<< Previous | Next >>
We scaffold the future with our aluminium products of superior quality.
|